Chen, J.C., Chen, C.-C., Su, L.-H., Wu, H.-B.,Sun, C.-J., Assembly line balancing in garment industry. Expert Systems with[1] Applications. 39(11), 10073-10081, 2012.
[2]Bongomin, O., Mwasiagi, J.I., Nganyi, E.O.,Nibikora, I., A complex garment assembly line balancing using simulation‐based optimization. Engineering Reports. 2(11), e12258, 2020.
[3]Ghosh, S.,Gagnon, R.J., A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. The International Journal of Production Research. 27(4), 637-670, 1989.
[4]Erel, E.,Sarin, S.C., A survey of the assembly line balancing procedures. Production Planning & Control. 9(5), 414-434, 1998.
[5]Tasan, S.O.,Tunali, S., A review of the current applications of genetic algorithms in assembly line balancing. Journal of intelligent manufacturing. 19, 49-69, 2008.
[6]Sivasankaran, P.,Shahabudeen, P., Literature review of assembly line balancing problems. The International Journal of Advanced Manufacturing Technology. 73, 1665-1694, 2014.
[7]Samouei, P., Fattahi, P., Ashayeri, J.,Ghazinoory, S., Bottleneck easing-based assignment of work and product mixture determination: fuzzy assembly line balancing approach. Applied Mathematical Modelling. 40(7-8), 4323-4340, 2016.
[8]Qattawi, A.,Chalil Madathil, S., Assembly line design using a hybrid approach of lean manufacturing and balancing models. Production & Manufacturing Research. 7(1), 125-142, 2019.
[9]Güner, M.G.,Ünal, C., Line balancing in the apparel industry using simulation techniques. Fibres & Textiles in Eastern Europe. 16(2), 75-78, 2008.
[10]Pröpster, M., März, L., Reinhart, G.,Intra, C., Validation of line balancing by simulation of workforce flexibility, 9th Conference on Intelligent Computation in Manufacturing Engineering, Procedia CIRP, 33, 93-98, 2015.
https://doi.org/10.1016/j.procir.2015.06.018
[11]ur Rehman, A., Ramzan, M.B., Shafiq, M., Rasheed, A., Naeem, M.S.,Savino, M.M., Productivity improvement through time study approach: a case study from an apparel manufacturing industry of Pakistan, 25th International Conference on Production Research Manufacturing Innovation: Cyber Physical Manufacturing, Procedia Manufacturing, 39, 1447-1454, 2019.
https://doi.org/10.1016/j.promfg.2020.01.306
[12]Sime, H., Jana, P.,Panghal, D., Feasibility of using simulation technique for line balancing in apparel industry, 14th Global Congress on Manufacturing and Management (GCMM-2018), Procedia Manufacturing. 30, 300-307, 2019.
https://doi.org/10.1016/j.promfg.2019.02.043
[13]Xuan, H.N.T., Hai, A.V.,Quang, A.N. Applying Genetic Algorithm for Line Balancing Problem in Garment Manufacture, Proceedings of the International Conference on Emerging Challenges: Strategic Adaptation in The World of Uncertainties (ICECH 2022), Atlantis Press, 2023. https://doi.org/
10.2991/978-94-6463-150-0_15
[14]Jolai, F., Jahangoshai Rezaee, M.,Vazifeh, A., Multi-criteria decision making for assembly line balancing. Journal of Intelligent Manufacturing. 20, 113-121, 2009.
[15]Ghadiri Nejad, M., Husseinzadeh Kashan, A.,Shavarani, S.M., A novel competitive hybrid approach based on grouping evolution strategy algorithm for solving U-shaped assembly line balancing problems. Production Engineering. 12(5), 555-566, 2018.
[16] Bahadır, S.K., Assembly Line-Theory and Practice, Chapter5: Assembly line balancing in garment production by simulation, InTech, Rijeka, 2011..
[17]Wang, Q., Owen, G.W.,Mileham, A.R., Determining numbers of workstations and operators for a linear walking-worker assembly line. International Journal of Computer Integrated Manufacturing. 20(1), 1-10, 2007.
[18]Pasha, N., An application of Aluminum windows assembly line problem using FLB: An application of COMSOAL algorithm. Uncertain Supply Chain Management. 3(2), 165-172, 2015.
[19] خسروی ف.، صادقی ع.، جولای ف.، بالانس خط مونتاژ پوشاک با منظور کردن یک نوع ماشین در هر ایستگاه کاری، هشتمین کنفرانس ملی مهندسی نساجی ایران، یزد، 1391.
[20]Shumon, R.H., Arif-Uz-Zaman, K.,Rahman, A., Productivity improvement through balancing process using multi-skilled manpower in apparel industries. International Journal of Industrial and Systems Engineering 1. 11(1-2), 31-47, 2012.
[21]Hanan, O.,Seedahmed, A., Garment assembly line balancing using modeling and simulation. International Journal of Scientific Engineering and Science. 3(3), 4-7, 2019.
[22]Manavizadeh, N., Hosseini, N.-s., Rabbani, M.,Jolai, F., A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach. Computers & industrial engineering. 64(2), 669-685, 2013.
[23]Elnaggar, G. Effect of operator skill level on assembly line balancing in apparel manufacturing: a multi-objective simulation optimization approach. Proceedings of the International Conference on Industrial Engineering and Operations Management, 2019.
[24]Tabaeeian, R.A.,Bordbar, G., A clarification of relationship between strategic human resource management and firm performance. ( case sudy: The Yazd elected spinning factories.). Journal of Textile Science and Technology. 6(3), 37-43, 2017.
[25]Kayar, M.,Akyalçin, Ö.C., Applying different heuristic assembly line balancing methods in the apparel industry and their comparison. Fibres & Textiles in Eastern Europe. 6 (108), 8-19, 2014.
[26]soltanzadeh, z.,Jaberzadeh Ansari, S., Optimization of Mixed Production Line in Sportswear Industry. Journal of Textile Science and Technology. 11(3), 52-67, 2022.